•
headrace
【【hedreis】】
英:
美:
常见释义:
进水渠:指将水引入到磨坊、水轮机或涡轮机中的水道。
n.
导水渠;送水渠
1、
headrace
bay ─── 人头湾
2、
headrace
channel ─── 导水沟
动词现在分词:
headquartering
动词过去式:
headquartered
动词第三人称单数:
headquarters
动词过去分词:
headquartered
1、headraces ─── n.导水渠;送水渠
2、headcase ─── n.疯子;失去理智的人
3、headframe ─── n.【矿业】井架
4、headache ─── n.头痛;麻烦;令人头痛之事
5、headreach ─── 想像可及之处
6、headage ─── n.(农场牲畜的)总头数
7、headgate ─── 大门
8、headspace ─── n.【军】顶端空间;【化学】顶部空间
9、headrail ─── n.(开球区的)前端;船首栏杆装置;窗帘盒(等于headbox);女头巾
1、Application of Multi-purpose Universal Instrument Section Measurement System in the
Headrace
Tunnel at Jinhe Hydropower Station ─── 徕卡多功能全站仪断面测量系统在金河水电站引水隧洞中的应用
2、Collapse treatment in section of Hongye-2 Hydroelectric Power Station
headrace
tunnel downstream of adit No. ─── 红叶二级水电站引水隧洞2号支洞下游塌方段处理。
3、The author comprehensively demonstrates the construction technique for excavation and support of chambers and tunnels under unfavorable geological condition,taking the construction of
headrace
tunnel as example. ─── 为此 ,以引水隧洞施工为例 ,对不良地质条件下的洞室开挖及支护施工技术进行综合阐述
4、paper gives brief description of new technique and new methods applied in construction survey for
headrace
tunnel at Shiziping hydropower station. ─── 阐述了狮子坪水电站引水隧洞洞内施工测量运用的新工艺和新方法。
5、
headrace
tunnel intake tower ─── 发电洞进水塔
6、
headrace
tunnel ─── 引水隧道
7、
headrace
bay ─── 前池
8、Application of Needle Beam Steel Form Jambo in Concrete Construction in
Headrace
Tunnel at Taishui Hydropower Station in Jilin Province ─── 针梁式钢模台车在吉林台水电站引水隧洞混凝土施工中的应用
9、Application of Pipe Shelf Support in the
Headrace
Tunnel Construction of Dafa Hydropower Station ─── 管棚支护在大发电站引水隧洞施工中的应用
10、An Unusual Geological Feature in Anthony
Headrace
Tunnel ─── 安东尼渠首非常见地质
11、Different tunnel lining design theory will have different results for the
headrace
tunnel. ─── 对于引水隧洞的衬砌设计,采用不同的设计理论会得出不同的结果;
12、General Support for Slope at Intake of
Headrace
Tunnel at Zipingpu Water Conservancy Project ─── 紫坪铺工程引水发电洞进口边坡综合支护施工
13、Program Module Management for Concrete Lining in
Headrace
Tunnel at Boluo Hydropower Station ─── 波罗电站引水隧洞混凝土衬砌的程序模块管理
14、
headrace
channel ─── 导水沟
15、The construction of key projects progressed smoothly, including the successful damming of the
headrace
and the completion of the principal part of the main dam on the left side of the Three Gorges Project;; ─── 重点工程建设进展顺利。长江三峡工程导流明渠截流成功,左岸大坝主体工程基本完成;
16、Concrete Lining Construction for Shafts of
Headrace
Tunnel at Bakun Hydropower Station ─── 巴贡水电站引水隧洞竖井群混凝土衬砌施工技术
17、Engineering Geological Analysis on Surrounding Rock Mass of
Headrace
Tunnel at Khadori Hydropower Project in Georgia ─── 格鲁吉亚卡杜里水电站引水隧洞岩体工程地质分析
18、Construction and Supervision for
Headrace
Tunnel and Caverns in the Powerhouse Area at Yaoheba Hydropower Station ─── 姚河坝水电站引水隧洞及厂区枢纽洞室群系统工程的建设监理
19、Foundation Improvement for Intake Tower of
Headrace
Tunnel at Zipingpu Water Conservancy Project ─── 紫坪铺水利枢纽引水发电洞进水塔基础综合加固施工技术
20、Engineering Geological Evaluation of Surrounding Rock Stability in
Headrace
Tunnel at Heihetang Hydropower Station ─── 黑河塘水电站引水隧洞围岩稳定性工程地质评价
21、Aqueduct tunnel,
Headrace
tunne ─── 导水隧道
22、Construction of large span steel truss bridge for intake tower of
headrace
at Tianshengqiao I Hydropower Station is introduced,including fabrication,transportation,installation and test. ─── 介绍了天生桥一级水电站引水道进水塔大跨度钢桁架桥施工的全过程,包括制作、运输、安装、试验等几个部分。
23、Supervision on
Headrace
Tunnel Construction at Futang Hydropower Station ─── 福堂水电站引水隧洞工程中的监理控制
24、Engineering Geological Evaluation of Surrounding Rock Stability in
Headrace
Tunnel at Heihetang Hydropower Station ─── 黑河塘水电站引水隧洞围岩稳定性工程地质评价
25、Quality Control for
Headrace
Tunnel Concrete Lining in Lot CV Contract for Shiziping Hydropower Station ─── 狮子坪水电站CV标引水隧洞混凝土衬砌质量控制
26、The 4. 1 km long
headrace
tunnel has a finished diameter of 5. 4m for concrete lined and 5. 9 m for shotcrete lined sections. ─── 1公里长的引水隧洞有精磨的半径为5.4米的混凝土衬砌和半径为5.9米的喷射混凝土衬砌断面。
27、Program Module Management for Concrete Lining in
Headrace
Tunnel at Boluo Hydropower Station ─── 波罗电站引水隧洞混凝土衬砌的程序模块管理
28、Abstract: Construction of large span steel truss bridge for intake tower of
headrace
at Tianshengqiao I Hydropower Station is introduced,including fabrication,transportation,installation and test. ─── 摘 要: 介绍了天生桥一级水电站引水道进水塔大跨度钢桁架桥施工的全过程,包括制作、运输、安装、试验等几个部分。
29、Excavation and Support Measures during Construction of
Headrace
Tunnel Maopiug Anticline Section in DCI Lot for Dafa Hydropower Station ─── 大发水电站DCI标引水隧洞毛坪背斜段开挖支护施工措施
30、Different tunnel lining design theory will have different results for the
headrace
tunnel. ─── 摘要对于引水隧洞的衬砌设计,采用不同的设计理论会得出不同的结果;
31、Foundation Improvement for Intake Tower of
Headrace
Tunnel at Zipingpu Water Conservancy Project ─── 紫坪铺水利枢纽引水发电洞进水塔基础综合加固施工技术
32、
headrace
system ─── 引水渠系统
33、This paper gives brief description of new technique and new methods applied in construction survey for
headrace
tunnel at Shiziping hydropower station. ─── 摘要阐述了狮子坪水电站引水隧洞洞内施工测量运用的新工艺和新方法。
34、This thesis builds “635”hydro-junction project
headrace
model without cracks and model with cracks in finite element software ANSYS. ─── 本文在有限元软件ANSYS中,建立“635”水利枢纽工程导流洞无缝状态下的模型和带缝状态下的模型。
35、Groundwater Treatment in Rich Water Section in
Headrace
Tunnel at Yele Hydropower Station ─── 冶勒水电站引水隧洞富水地段地下水处理
36、Collapse treatment in section of Hongye-2 Hydroelectric Power Station
headrace
tunnel downstream of adit No. ─── 引水隧洞2号支洞下游塌方段处理。
小学三年级音标规则
元音分为单元音、双元音以及辅音。单元音总共有12个,双元音共有8个,辅音有4个。看起来需要记住的元音读音并不多,但是要学会并记住它还是需要一些时间的。三年级学生刚开始学音标,最难的就是记不住元音自己的读音,不知道怎么拼读。采用谐音的方式来记住这些元音的读音,就容易多了。比如:【i:】--谐音为:易(yi);像数字1,这样记忆起来就非常容易了。
继续看其他的元音发音,【:】--谐音为:噢(0);噢,这个音标就像个o。【u:】--谐音为:雾(wu);杯子上有很多雾。【:】--谐音为:饿(e);一只鹅饿得晕倒了。【ɑ:】--谐音为:啊(a);音标的读音跟拼音一样。【e】--谐音为:夜(ye);这只鹅喜欢走夜路。